- Messages
- 13
- Reactions
- 4
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
The top rail on mine is held by a spring loaded plunger in the gas block and rabbit and groove in the block on the chamber end are two pins. No screws are involved at all. I am not sure if this is unique to the Para USA ZM LR 300 or not.I always put locktite on my rails. Are you sure you have the right length screws?